Developing a proof-of-concept solution to reliably forecast turnaround times

A common problem in steel-product manufacturing is the significantly high throughput time of steel products in comparison to the sum of their process times. Manufacturers have similar production methods which, upon investigation, are likely to yield improved time efficiency resulting in a higher relative touch time per product. To lower production times, it would be optimal to introduce production planning with higher levels of dynamicity, granularity and detail.

 

KORT is a project working towards developing a proof-of-concept solution that can reliably forecast turnaround times. This is achieved by influencing the waiting time of products through detailed production planning. The focus of this project will lie on determining the factors that influence throughput time and identifying opportunities to manipulate them. It will help to recognise and categorise the similarities our industry partners possess, based upon their physical and digital infrastructure.

 

This will form the backbone of a decision model which will steer the planning process more accurately. Historical and real-time ERP data is used to develop a modular framework which supports detailed and flexible production planning, resulting in a new, robust planning and control solution. We can then use this demonstrator as a new industrial standard, or an object lesson to guide steel-product manufacturers when adjusting and/or improving their production planning.

Industry partners

suplacon

Work packages of project

Every AMC project is divided into seperate work packages, to clearly distinguish the several stages and purposes within the project. The KORT project consists of five work packages.

WP 1 – Assessment

An audit to assess the current production technology 

WP 2 – Data Analysis

The data is analysed to get insight into the current situation

WP 3 – Modelling and Simulation

During this work package points of improvement can be identified

WP 4 – Optimization and Demonstration

The current process will be optimised and demonstrated

WP 5 – Knowledge Transfer

Training of the workforce about the AM technique to be applied

The KORT Team

Maaike Slot_Circle

Maaike Slot
Project Manager
Fraunhofer Project Center

GuoCheng_Circle

Cheng Guo
Research Engineer
Fraunhofer Project Center

Ivana Mishikj_Circle

Ivana Mishikj
Project Manager
Fraunhofer Project Center

Demitriana Minassian_Circle

Demitriana Minassian
Research Engineer
Fraunhofer Project Center

Vasos Arnautis_Circle

Vasos Arnaoutis
Research Engineer
Fraunhofer Project Center

Projects by Fraunhofer Project Center

Read how Fraunhofer Project Center works with industries to create industrial solutions that are implementable and effective.

Development of innovative materials for Polaroid.

 

Read more

Driving quality and cost efficiency for the aerospace industry.

Read more

Visualisation to aid the decision making process.

 

Read more